
No reason whatever to hold up traffic through two rush hours.

The concrete is dug out of the refuge but the road is unchanged. What are the lights for?

I wonder when the speed indicator will be restored to service. It has been disconnected for a year now.
Just how many poles do we need in Abbey Road? It used to be pleasant and accident free but thanks to our Conservative council and the brainless morons in the traffic department its beginning to look like a scrap metal yard. And we didnt have the puddle before the kerb was built out into the road.

By 9 a.m. the hole had been filled in with fresh concrete. Its been left rough so it looks like someone will be coming back. No sign of a pole though.

Another view of the carriageway, totally undamaged if one ignores the Bashford/Craske buffoonery and not undergoing repair, but which has been traffic controlled for most of the last 24 hours.